Update 2/14/20: New Response: We have reviewed the current OEM service information for the SCAN,PRE-REPAIR and POST REPAIR (GN 1060/1088). The SCAN,POST-REPAIR (GN 1088) labor time has changed from 0.1 hours to 0.2 hours. For this type of operation Audatex provides and includes connect station, read and reset DTCs. The change will appear on April 2020 release.
Inquiry Type: All Other
Database: Audatex
Issue Summary: Insurance provided estimate using Audatex shos .2 PRE SCAN and .1 POST SCAN for Database version 8.0643 My current Database 8.0642 does not show any labor. .2 and .1 scanning labor that the insurer estimate states is straight from the database. These labor times .2 and .1 are NOT accurate and need to be removed for the repairer to perform an on the spot evaluation.
Individual Procedure Steps:
Actual Time To Complete: hours minutes
Suggested Action: Remove time so the repairer to determine what is actually needed to scan the vehicle after a collision.