Inquiry Details


Submission Information
Tracking #: 16518
Date Submitted: 07/02/2020
Status: Resolved (DEG Response)
Inquiry Resolution

Previous response provided by CCC/MOTORS 6608 "IP Explanation Estimated Release Date: Closed Proposed Resolution: MOTOR stated: There is no industry standard estimated work time to be used as "set-up" for Frame Straightening Equipment, as there are many types used in the field. An example of this could be a "Dedicated Bench System" versus a "Laser Target Type System." The difference in set-up time can vary significantly due to Rocker Moldings or other types of trim that may need to be removed to access mounting points or measuring points. MOTOR cannot determine the type of Frame Measuring Equipment a particular shop is using; therefore, an on-the-spot evaluation is the best way of determining an estimated work time. No changes required"

Vehicle Information
Year: 2018
Make: Chevrolet
Model: Silverado
Body:
Database Inquiry

Inquiry Type: All Other

Database: CCC

Issue Summary: Is setting up, anchoring, measuring and dismounting from frame rack all the same operation? Would a full frame require a different time than allowance than a unitized body?

Individual Procedure Steps: setting up, anchoring, measuring and dismounting from frame rack

Actual Time To Complete: 3 hours 25 minutes

Suggested Action: Add a footnote explaining the differences in actions, racks and vehicle construction

Edit Inquiry Fields

Vehicle


*
*
*
*

Contact Information


*
*
*

Database Inquiry


If applicable
hours minutes
hours minutes
square inches
hours minutes

Attachments


Resolution Date