Inquiry Details


Submission Information
Tracking #: 16519
Date Submitted: 07/02/2020
Status: Resolved (IP Change)
Inquiry Resolution

Estimated UM Release Date: 08/03/2020 Estimated Graphics Release Date: MM/dd/yyyy Proposed Resolution: MOTOR stated: After review, in the Rear Body & Floor group, a Sectioning Operation Section Upper Rail has been added with an estimated refinish time of 1.5 hours and an estimated work time of 5.1 hours and a footnote that states, “LABOR: Time is after rear bumper cover and all necessary bolted on parts are remove. Time is for sectioning as outlined in the OEM service manual. Time includes removing required section from OEM service part.” After review, in the Rear Body & Floor group, Floor & Rails, Floor & Components subgroup the following updates have been made: • Added all available subgroup components for the 2019-2020 model years. • Updated graphic (LD# BN19675) to reflect changes. After review, in the Rear Body & Floor group, Floor & Rails, Rails & Components subgroup, the following updates have been made: • Added Upper Rail RH (84487016 @ $0.00) with an estimated work time of 10.0 hours and a footnote that states “LABOR: Time is after rear bumper cover and all necessary bolted on parts are remove. Time is for complete part replacement, for sectioning see SECTIONING OPERATIONS.”, LH (84329945 @ $0.00) with an estimated work time of 10.0 hours and a footnote that states “LABOR: Time is after rear bumper cover and all necessary bolted on parts are remove. Time is for complete part replacement, for sectioning see SECTIONING OPERATIONS.” • Added all available subgroup components for the 2019-2020 model years. • Updated graphic (LD# BN19677) to reflect changes. After review, in the Rear Body & Floor group, a Sectioning Operation Section Upper Rail has been added with an estimated refinish time of 1.5 hours and an estimated work time of 5.1 hours and a footnote that states, “LABOR: Time is after rear bumper cover and all necessary bolted on parts are remove. Time is for sectioning as outlined in the OEM service manual. Time includes removing required section from OEM service part.” After review, in the Rear Body & Floor group, Floor & Rails, Floor & Components subgroup the following updates have been made: • Added all available subgroup components for the 2019-2020 model years. • Updated graphic (LD# BN19675) to reflect changes. After review, in the Rear Body & Floor group, Floor & Rails, Rails & Components subgroup, the following updates have been made: • Added Upper Rail RH (84487016 @ $0.00) with an estimated work time of 10.0 hours and a footnote that states “LABOR: Time is after rear bumper cover and all necessary bolted on parts are remove. Time is for complete part replacement, for sectioning see SECTIONING OPERATIONS.”, LH (84329945 @ $0.00) with an estimated work time of 10.0 hours and a footnote that states “LABOR: Time is after rear bumper cover and all necessary bolted on parts are remove. Time is for complete part replacement, for sectioning see SECTIONING OPERATIONS.” • Added all available subgroup components for the 2019-2020 model years. • Updated graphic (LD# BN19677) to reflect changes.

Vehicle Information
Year: 2019
Make: Cadillac
Model: XT4
Body: Sedan
Database Inquiry

Inquiry Type: Missing Information

Database: CCC

Area of Vehicle: Rear Body And Floor

Missing Part Name: LT Frame Rail

Missing Part Description:

OEM Part Number: 84329945

Missing Information: labor and refinish time

Issue Summary: CCC has no information in rear body and floor - floor and rails section. Specifically labor & refinish time for sectioning LT rear frame rail.

Suggested Action: Labor & Refinish Sectioning LT rear frame rail

Edit Inquiry Fields

Vehicle


*
*
*
*

Contact Information


*
*
*

Database Inquiry


If applicable
hours minutes
hours minutes
square inches
hours minutes

Attachments



1. IMG_1447.JPG

Resolution Date