Tracking #: 892
Date Submitted: 11/19/2008
Status: Resolved (IP Change)
Inquiry Resolution

IP Explanation The Audatex labor allowances for a welded replacement panels includes the following operations body fill labor,Block sand, Application of guide coat, and Dual action sand required to bring the welded seams areas to to new undamaged condition per the 2008-2009 Database Reference Manual section 4-3 Replacement & Recycled Operations and 4-5 Refinish Operations. The reference to 150 grit finishing of a panel only applies to a panel that is repaired not a panel that has been replaced as per Section 4-4 Refinish Guidelines Feather/Prime/Block.  

Vehicle Information
Year: 2004
Make: PONTIAC
Model: GRAND AM
Body: Undefined
Inquiry Description

Inquiry Type: Procedure Page Issue

Description: Feather Prime and Block

Inquiry Details
AreaVehicle//WELDED PANELS IssueSummary//IN A EXAMPLE OF A WELDED ON QUARTER PANEL AUDATEX STATES THAT THE FILL AND BLOCK SAND IS INCLUDED. HOWEVER THE P-PAGES DO NOT STATE TO WHAT GRAIN OF SAND PAPER IS THE FINISH PRODUCT OF THE SPOT WELDS AND SEAM WELDS. BOTH OF THE OTHER MAJOR DATA BASES GIVE REFERENCE TO WELDS AND SEAM WELDS TO BE FINISHED TO 150 GRIT. THE REFINISH TIME IS STATED TO START AT 320. THERE WOULOD SEAM TO BE SOME GAP TIME THERE IN THE VARIABLE THAT NOT ALL WELDS WOULD NEED TO BE FINISHED BEYONED 150 IF NOT VISABLE. SuggestedAction//PLEASE VERIFY THE OPERATIONS AS STATED FOR WELD ON PANELS AND FINISH OF SEAM AND SPOT WELDS AS NEEDED
Edit Inquiry Fields

Vehicle


*
*
*
*

Contact Information


*
*
*

Database Inquiry


If applicable
hours minutes
hours minutes
square inches
hours minutes

Attachments


Inquiry Details (from old database)


Resolution Date